ARTICLE 17
By petition of Dennis Senibaldi
and others To see if the Town will vote to raise and appropriate
the sum of $250,000 dollars representing the cost of engineering, design plans
and construction costs associated with the construction of Phase I of the
Spruce Pond Recreation Field, (Tax Map 3-B-601). Phase
I to include the construction of a recreational sports field usable for, but
not limited to, Soccer, Lacrosse, and Football, a parking area, as well as the
initial preparation work associated with the final Phase II, namely the
construction of a baseball field. Further to authorize the Board of Selectmen
to apply any federal, state or private funds made available therefore toward
the cost of the project. This will be a non-lapsing account per RSA 32:7, VI
and will not lapse for a period of two (2) years. A total of $260,000 worth of
material and construction donations where previously given to the town to
complete the preliminary site preparations for this project. Further should
Article 16 fail this article shall be declared null and void.
Recommended by Board of Selectmen
(2-2)
·
Phil Lochiatto, Bruce
Breton for.
·
Kathleen DiFruscia,
Roger Hohenberger opposed.
Meetings:
Meeting video clips shown have been shortened for
content. The full meeting video may
be obtained at wctv.pegcentral.com.
·
2/11/12
Town Deliberative Session (Entire meeting video can be found here)
o
WCTV Video Clip(00:45:34)